SEATTLE HOUSE LIFTING & SHORING — SINCE 1974 · WA LIC #NORTHSS803DS · LICENSED · BONDED · INSURED

NW Structural & Shoring — Since 1974

House Lifting & Raising in Seattle

We lift homes across Puget Sound and beyond — including remote cabins and riverfront property — for new foundations, taller basements, ADUs, added stories, and flood protection — engineered, permitted, and set back down on solid ground. For fifty years, Seattle homeowners and contractors have called us for the lifts other companies walk away from.

FREE SAME-DAY SITE VISITS · CALL JEFF (206) 714-0096

When you need this

Single-story Seattle rambler raised on cribbing for a full house lift

Taller ceilings & basement ADUs

Lift the house, dig down or build up, and turn a 6-foot crawl into legal living space — the fastest path to a basement ADU under Washington’s HB 1337 rules.

Add a story instead of moving

We lift and hold your home while a new first floor is framed beneath it — we’ve turned a single-story home into a three-story home.

Floodplain elevation

Raise your home above base flood elevation to protect it and cut flood insurance premiums — King County requires BFE+3 ft for new work in floodplains.

The same rambler carried on steel I beams while its new foundation is built

New foundation

The right fix for a failing pre-war foundation: lift, replace, set back down.

Why Seattle homes need it

Old houses, wet ground

Seattle sits on glacial till and outwash that stays put when dry but softens and shifts through our long wet season. Thousands of the city’s pre-1950 homes were built on shallow, unreinforced foundations or post-and-pier framing that was never designed for today’s loads — or today’s rainfall. When those foundations crack, tilt, or sink, patching rarely holds. Lifting the house and building a proper foundation beneath it solves the problem at its source, and it opens the door to the basement, ADU, or added story the original builders never imagined.

Our approach

Every lift starts with an engineered lift plan — we bring in the structural engineer and coordinate the design team. We support the house on steel I beams and cribbing, then raise it with a unified hydraulic jacking system so every point moves together — whether the lift is a few inches or a full story, the house stays level the whole way.

Once the house is up, it rests on locked steel cribbing while the new foundation, basement, or first floor is built beneath it. Homes generally stay habitable while cribbed, and we coordinate utility disconnects and reconnects so service is only interrupted around the lift itself.

We run SDCI and county permits and coordinate the engineering behind them, and we set the house back down only after the new structure beneath it passes inspection.

How it works

1

Site visit & estimate

Free and no pressure. We walk the site, listen, and give you a straight assessment with a written estimate.

2

Engineering & permits

We help assemble the design team — architecture, structural engineering, and geotech — and run the SDCI or county paperwork.

3

Lift / shore / build

Our crews do the structural work — homes stay habitable during most projects.

4

Final inspection & sign-off

Work is inspected, documented, and signed off before we call the job done.

Related services

Foundations

Replace a cracked or settling foundation — we lift the house and build it a new one.

Pin Piles

Underpin and re-level structures on soft or sloping ground with driven steel piles.

Excavation

Basement dig-outs, grading, and structural excavation under occupied homes.

Straight Answers

How much does it cost to lift a house in Seattle?

Lifting a house independently of its existing foundation — to raise it or replace what is underneath — generally runs $10,000–$100,000 depending on size, access, and soil. Every project gets a written estimate after a free site visit.

Can we live in the house while it is lifted?

In most of our projects, yes — homes generally stay habitable while cribbed, though utilities are briefly disconnected during the lift itself.

How long does a house stay lifted?

Typically 3–6 months while the new foundation, basement, or first floor is built beneath it.

Do I need a permit to lift my house in Seattle?

Yes. Lifts require structural permits (SDCI in Seattle, county elsewhere). We coordinate the engineer and run the permitting as part of the job.

Recent house lifting projects

Get a straight answer about your house

Free site visit, honest assessment, written estimate — often the same day you call. Ask for Jeff.